<!--?xml version="1.0" encoding="utf-8"?--><html><head><style>
/* CSS de fallback généré automatiquement */
* {
    box-sizing: border-box;
}

body {
    font-family: Georgia, "Times New Roman", serif;
    font-size: 16px;
    line-height: 1.6;
    color: #333;
    background-color: #fafafa;
    margin: 0;
    padding: 20px;
}

header, nav, main, article, section, aside, footer {
    display: block;
}

h1, h2, h3, h4, h5, h6 {
    font-family: Arial, Helvetica, sans-serif;
    color: #222;
    margin-top: 1.5em;
    margin-bottom: 0.5em;
    line-height: 1.2;
}

h1 { font-size: 2em; border-bottom: 2px solid #ddd; padding-bottom: 0.3em; }
h2 { font-size: 1.6em; }
h3 { font-size: 1.3em; }

p {
    margin: 1em 0;
}

a {
    color: #0066cc;
    text-decoration: none;
}

a:hover {
    text-decoration: underline;
    color: #004499;
}

img {
    max-width: 900px;
    height: auto;
    border: 1px solid #ddd;
    padding: 4px;
    background: #fff;
}

table {
    border-collapse: collapse;
    margin: 1em 0;
    width: 100%;
    max-width: 900px;
}

th, td {
    border: 1px solid #ccc;
    padding: 8px 12px;
    text-align: left;
}

th {
    background-color: #f0f0f0;
    font-weight: bold;
}

tr:nth-child(even) {
    background-color: #f9f9f9;
}

ul, ol {
    margin: 1em 0;
    padding-left: 2em;
}

li {
    margin: 0.5em 0;
}

blockquote {
    margin: 1em 0;
    padding: 10px 20px;
    background-color: #f5f5f5;
    border-left: 4px solid #ccc;
    font-style: italic;
}

pre, code {
    font-family: "Courier New", Courier, monospace;
    background-color: #f4f4f4;
    padding: 2px 6px;
    border-radius: 3px;
}

pre {
    padding: 15px;
    overflow-x: auto;
    border: 1px solid #ddd;
}

hr {
    border: none;
    border-top: 1px solid #ddd;
    margin: 2em 0;
}

form {
    margin: 1em 0;
}

input, textarea, select, button {
    font-family: inherit;
    font-size: inherit;
    padding: 8px 12px;
    margin: 4px 0;
    border: 1px solid #ccc;
    border-radius: 4px;
}

button, input[type="submit"], input[type="button"] {
    background-color: #0066cc;
    color: white;
    border: none;
    cursor: pointer;
}

button:hover, input[type="submit"]:hover, input[type="button"]:hover {
    background-color: #0055aa;
}

/* Conteneur principal centré */
body > * {
    max-width: 960px;
    margin-left: auto;
    margin-right: auto;
}
</style></head><body><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Project Constellation: Comments</title>
<link/>http://www.projectconstellation.us/news/
    <description>Latest comments for Project Constellation</description>
<language>en-us</language>
<lastbuilddate>Fri, 25 Mar 2005 10:33:46 -0800</lastbuilddate>
<generator>Movable Type v3.15</generator>
<ttl>60</ttl>
<item>
<title>Adam comments on "Russia Developing New Spacecraft"</title>
<description><!--[CDATA[<p-->klippers competion for the future russian manned spacecraft

<p><a href="http://www.russianspaceweb.com/tks_followon.html" rel="nofollow">http://www.russianspaceweb.com/tks_followon.html</a></p>
<p>also south korea has announced that it is useing the first stage of the angara rocket for there upcoming korean LV, to be launched at Goheung(which is under construction).</p>
<p>It looks like S korea is paying to finish developement of the angara, which could be the future russian manned launch vehicle</p>]]&gt;
        - Adam</description>
<pubdate>Tue, 17 Feb 2004 10:43:19 -0800</pubdate>
<dc:contributor>Adam</dc:contributor>
</item>
<item>
<title>Kagura comments on "NASA mulls early retirement for space shuttle"</title>
<description><!--[CDATA[<p-->     I think before we retire the shuttle we need to get a new vehical for assured ISS access we lost our first station skylab from not having a manned vehical for over 6 years.<br/>
 What we can do is one go with a russian craft such as fund klipper,tks or MAKS for this.

<p>    But if politics or NIH syndrome doesn't it allow we could rush an apollo derivative manned tug in a few years yes I know it will not meet the full CEV requirments but it could be used as a test mule for the full CEv system.<br/>
   But the quickist thing we can do is dust off the X38 and turn it from the CRV to an assured access vehical this could be ready very quickly and later could be used in as a componet of constellation but it's a little short on room so four vs 6 people.<br/>
Or just dangle a 200 million infront of the Xprize startups they will build something quickly.<br/>
On the shuttle and finishing ISS building shuttle-c is a great ideal as you will get a 80ton launch vehical in the deal .You can launch all remianing modules fully equipted and stocked .This launch vehical also would be very usefull to the constellation program later.for launching parts that are too heavy for the existing EELVs such as trans lunar stages and lunar habs and just about everything on a mars mission.</p>
<p>Also on launching an ISS module on anything other then a shuttle you will need tug or to add engines to the modules.<br/>
To launch an ISS module on an EELV you need more then a cradle.<br/>
This is the reason the russian modules are more cramped then the US ones even though they are about the same size on the out side.They had to have their own propulsion and navigation this stuff is not light or small. it may be possible to have a shuttle capture and drag an ISS module launched by an EELV or use a soyuz/progress to move it.<br/>
Though shuttle-c is so powerful you could launch a manuvoring module with an ISS module and still have payload capacity to burn.<br/>
Just base it on a proven satilite bus or the whole back end of the ESA ATV.</p>
<p>The apollo or the Russian TKS <a href="http://www.russianspaceweb.com/tks_followon.html" rel="nofollow">http://www.russianspaceweb.com/tks_followon.html</a> would make a usefull tug and could form the first part of constelation.<br/>
The baseline TKS <a href="http://www.russianspaceweb.com/tks.html" rel="nofollow">http://www.russianspaceweb.com/tks.html</a> is still manufactured  and one is part of ISS minus the reentry capsule.<br/>
</p>]]&gt;
        - Kagura</description>
<pubdate>Fri, 29 Oct 2004 11:33:29 -0800</pubdate>
<dc:contributor>Kagura</dc:contributor>
</item>
<item>
<title>Dogsbd comments on "Mike Griffin is new NASA Administrator"</title>
<description><!--[CDATA[<p-->Keith Cowings' NASAWatch.com has a list of links to Griffin's past testimony before Congress on space exploration issues. I've read every word (actually read them months ago), and I am very impressed with this man. Also read the "Extending Human Presence into the Solar System" paper he co-led in producing with the Planetary Society. Excellent reading.

<p>Griffin has the potential to be the best NASA Administrator, ever.</p>]]&gt;
        - Dogsbd</description>
<pubdate>Thu, 10 Mar 2005 20:02:32 -0800</pubdate>
<dc:contributor>Dogsbd</dc:contributor>
</item>
<item>
<title>Rick Boyett comments on "Mike Griffin is new NASA Administrator"</title>
<description><!--[CDATA[<p-->On paper, Mike Griffin looks like a dream team choice for the position and I only say that because I know nothing about him except what is in the article.  It seems like we have someone that is genuinely interested in "Boldly Going" somewhere.  Is this a HOPEFULL sign of things to come?  It sure does give me some hope.  ]]&gt;
        - Rick Boyett</description>
<pubdate>Thu, 10 Mar 2005 20:02:32 -0800</pubdate>
<dc:contributor>Rick Boyett</dc:contributor>
</item>
<item>
<title>Kagura comments on "NASA BUDGET GETS 2.4% INCREASE FOR 2006"</title>
<description><!--[CDATA[<p-->   I have to agree with Chuck we will need use of a saturn class launcher if we want a moon base.<br/>
Since building a moon base will require landing 20 ton modules on the surface of the moon thats just the hab modules and no descent stage.<br/>
Double that to around 40 tons for the descent stage to a lunar    <br/>
trajectory similiar to GTO in delta V needs.<br/>
The SDV is the fastest way the get a saturn class launcher trhat can scale bigger then saturn V yet still be cheaper.<br/>
It is cheaper to launch one big vehical vs 5 small ones once you include the cost of mission planning ,dealing with buracracy,range fees,and tracking.<br/>
The sdv also can provide a cheap 50% reusable medium launcher for LEO ISS taxi mission which will be almost a gimme as if you add a lH2 upper stage to an SRB you get a dirt cheap 16 to 25 ton class launcher just barely big enough for LEO cev missions.The srb's g loading will stay similiar to a shuttle's if it's carrying a 70 to 130 ton fueled upper stage.<br/>
The heavy EELVs can fill in medium class the 25 to 35 ton missions such as building stations, launching telescopes,and large probes like JIMO.<br/>
They also would be ideal for cargo vessles .<br/>
Probley a simple reusable upper stage with ballistic return similiar to the K1's upper stage or just make something like an iss module with it's own propulsion and guidance thats single use.Think ESA's ATV but larger.<br/>
I think a fueled shortened K1 upper stage + a delta IV heavy or atlas V 552 could be used to resupply an L1 station which was launched by a SDV.]]&gt;
        - Kagura</description>
<pubdate>Mon, 07 Feb 2005 11:02:06 -0800</pubdate>
<dc:contributor>Kagura</dc:contributor>
</item>
<item>
<title>Daniel comments on "End of Conspiracy Theories? Spacecraft Snoops Apollo Moon Sites"</title>
<description><!--[CDATA[<p-->It might help that SMART-1 is an ESA probe, and thus a bit more "independent" ...

<p>But as you say, the true believers will not let something as inconvenient as facts sway their convictions.</p>]]&gt;
        - Daniel</description>
<pubdate>Fri, 04 Mar 2005 22:05:42 -0800</pubdate>
<dc:contributor>Daniel</dc:contributor>
</item>
<item>
<title>Harold LaValley comments on "NASA Issues Solicitation for Crew Exploration Vehicle"</title>
<description><!--[CDATA[<p-->From the [url=<a href="http://prod.nais.nasa.gov/cgi-bin/eps/sol.cgi?acqid=113638]" rel="nofollow">http://prod.nais.nasa.gov/cgi-bin/eps/sol.cgi?acqid=113638]</a> CREW EXPLORATION VEHICLE, SOL NNT05AA01J[/url] document page. I have taken a few minutes to go though some of the documents to summarize the key points to allow for more discusion.

<p>For those that need to know the [url=<a href="http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-006.doc]Acronym" rel="nofollow">http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-006.doc]Acronym</a> List[/url] and a [url=<a href="http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-011.doc]" rel="nofollow">http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-011.doc]</a> glossary[/url]</p>
<p>[url=<a href="http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-001.doc]Final" rel="nofollow">http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-001.doc]Final</a> Request for Proposal (RFP) NNT05AA01J, Crew Exploration Vehicle, Phase 1 Contract[/url]</p>
<p>[quote]The Nation’s Vision for Space Exploration sets a goal of developing a new Crew Exploration Vehicle by 2014 that is capable of carrying astronauts beyond low Earth orbit and a goal of landing astronauts on the Moon no later than 2020.  The CEV represents one building block in a future exploration architecture that can send astronauts to the moon and form the basis for exploration missions to other destinations.</p>
<p>Crew Exploration Vehicle is a full and open competition.  The anticipated period of performance is September, 2005 through December, 2008.[/quote]</p>
<p>[url=<a href="http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-005.doc]Scope" rel="nofollow">http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-005.doc]Scope</a> of the Crew Exploration Vehicle Statement of Work[/url]</p>
<p>[quote]•	Crew Exploration Vehicle (CEV) – The system that transports humans to Low Earth Orbit (LEO), Lunar Orbit and back to Earth.<br/>
•	Crew Transportation System (CTS) – The CEV, the CEV launch vehicle, and the ground systems necessary to operate the CEV.<br/>
•	Constellation – The elements of the Constellation System of Systems including the CEV Launch Vehicle, Lunar Surface Access Module, Earth Departure Stage, Ground Support System, In-Space Support System, Destination Surface Systems, and other Constellation Systems such as a common docking mechanism, common rendezvous and proximity operations sensors, the common Constellation communications architecture, flight crew equipment including provisions for EVA, and standardized human interfaces.[/quote]</p>
<p><br/>
[url=<a href="http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-004.doc]Statement" rel="nofollow">http://prod.nais.nasa.gov/eps/eps_data/113638-SOL-001-004.doc]Statement</a> of Objectives for the Crew Exploration Vehicle[/url]</p>
<p>[quote]On January 14, 2004, the President of the United States directed the National Aeronautics and Space Administration (NASA) to embark on a robust space exploration program that will advance the Nation’s scientific, security, and economic interests. To meet the goals and objectives of our new vision, NASA plans to deploy a set of systems, large and small, that will be integrated into a “system of systems”. This includes Earth-to-orbit and in-space transportation systems, systems required for human health and performance, and robotic systems that will assist humans as they travel and explore.</p>
<p>CEV is the first component in the system-of-systems that will be built under the NASA Constellation Program and is the subject of this request for proposals.</p>
<p>•	Spiral 1: Earth Orbit Capability.  Spiral 1 establishes the capability to test and checkout crew transportation system elements in Low Earth Orbit in preparation for future human exploration missions to the Moon.  As new exploration elements necessary for future spirals are developed, they will be tested with the Spiral 1 CEV in the space environment to prepare for future exploration. The objective of crewed access to low earth orbit will be met by 2014.<br/>
•	Spiral 2: Extended Lunar Exploration.  Spiral 2 establishes the capability to conduct human exploration missions on the surface of the Moon for extended durations. In this context, extended duration is defined as the capability to support the crew on the surface of the Moon for a minimum of four days.  This objective will be met in the 2015-2020 timeframe.<br/>
•	Spiral 3: Long Duration Lunar Exploration.  Spiral 3 establishes the capability to conduct routine human long duration missions on the surface of the Moon to test out technologies and operational techniques for expanding the human presence to Mars and beyond. Missions in Spiral 3 will extend in duration from those obtained in Spiral 2 up to several months to serve as an operational analog of future short stay Mars missions.  This objective will be met after 2020.</p>
<p>A key aspect to spiral development will be to develop new technologies that improve performance and lower cost over time.  This is crucial to maintaining affordability and achieving the Nation’s goals for future exploration.  </p>
<p>[b]The CEV is designed from the outset as a key element of the Constellation “System of Systems” meeting at minimum Spiral 2 requirements with a clear plan to meet Spiral 3 requirements.  Meeting Spiral 3 from the outset is a goal.[/b]</p>
<p>•	Spiral 1 components include the CEV, a CEV launch vehicle, and ground support systems infrastructure.  The CEV and launch elements will safely transport the crew from the surface of the Earth to Low Earth Orbit and return them to the Earth’s surface at the completion of the mission.  The Launch System provides the capability to launch the CEV to Low Earth Orbit.  The CEV provides the necessary crew habitation functions during ascent, on-orbit, and entry, including mission aborts.<br/>
•	Spiral 2 consists of the Spiral 1 elements, or derivatives of those elements, plus the Earth Departure Stage (EDS) to transport elements to the lunar vicinity as well as the Lunar Surface Access Module (LSAM) that provides the capability for the crew to access the lunar surface.  The CEV provides crew habitation from launch to lunar orbit and return to the Earth surface, including aborts during Earth ascent.  The CEV provides the transportation functions to return from lunar orbit to the Earth surface.  The EDS provides the propulsive accelerations needed to transfer the various flight elements (CEV and LSAM) from Low Earth Orbit to lunar orbit and provides the deceleration for lunar orbit insertion.  The LSAM provides the crew habitation and transportation functions from lunar orbit, to the lunar surface, and return back to lunar orbit. In addition, the LSAM provides the capability for the crew to conduct science and perform routine EVA on the surface of the Moon.  Finally, the Cargo Delivery System (CDS) is used to deliver un-crewed elements to low Earth orbit and/or lunar orbit. The CDS consists of an EDS and a Cargo Launch Vehicle.<br/>
•	Spiral 3 requires various additional surface elements to support the crew for the long duration missions. These surface elements have not been completely defined at this point, but will provide basic functional capabilities including habitation, communication, power, extended range mobility, enhanced science capabilities, and other functions.</p>
<p><br/>
For purposes of this request for proposals, industry is expected to provide an initial concept for a CEV spacecraft that shall:</p>
<p>1.	Have a total gross liftoff weight (GLOW) of less than 20 metric tons.<br/>
2.	Provide an abort capability during all phases of flight.<br/>
3.	Be 2-fault tolerant to hardware component failures within safety critical systems except where design to minimum risk is approved by NASA.<br/>
4.	Integrate with the Launch Vehicle (LV) to achieve low earth orbit.<br/>
5.	Integrate with the Earth Departure Stage (EDS) to achieve lunar orbit.<br/>
6.	Integrate with the Lunar Surface Access Module to achieve lunar surface mission objectives.<br/>
7.	Integrate with Ground Support Systems for launch processing and mission control.<br/>
8.	Integrate with In Space Support Systems to support overall Constellation command, control, communication, and information requirements.<br/>
9.	Be capable of orbital maneuvers and rendezvous/docking with other Constellation systems. <br/>
10.	Be capable of return from lunar orbit to the earth surface without assistance from external Constellation elements.<br/>
11.	Be capable of supporting human life from launch on the earth surface through mission complete on earth surface during a maximum CEV crewed mission duration of 16 days.<br/>
12.	Abort capability independent of LV or EDS flight control.<br/>
13.	Be capable of unmanned operations for test flight purposes during Spiral 1 efforts and during lunar surface activities for Spirals 2 and 3.<br/>
14.	Minimizing ground processing interfaces while maintaining redundancy separation standards and minimizing potential hazards.<br/>
15.	Provide the capability to conduct missions with 1, 2, 3, and 4 crewmembers with a minimum habitable volume of 3.54 cubic meters per crew member.</p>
<p>Initial Performance Parameters </p>
<p>1.	Launch weight mass trades (both increases and decreases), including taking advantage of performance gains by mass reduction during ascent<br/>
2.	Ability to abort anytime during all mission phases<br/>
3.	Inclusion of the LSAM functionality within the CEV system<br/>
4.	CEV direct return vs. Earth Capture<br/>
5.	Mission Duration (both manned and unmanned mission phases)<br/>
6.	Crew size (up to 6 crew members) and crew habitable volume allocations.<br/>
7.	Splitting CEV functionality into modules (e.g.,  earth surface to LEO, LEO to Lunar orbit, Lunar orbit to Earth return)<br/>
8.	Human Rating Requirements cost drivers<br/>
9.	CEV system support of spiral 3<br/>
10.	CEV support for transfer of crew to and from International Space Station (ISS)<br/>
11.	CEV support of Extra-Vehicular Activities (EVA) operations<br/>
12.	Provisions for common Constellation System elements (eg  Docking systems, Communication systems)<br/>
[/quote]</p>
<p>I note that the spirals are to use the cev for each and must have a plan for this. Sort of designing the CEV from its destination and working backwards to the starting point for a modular construction.</p>]]&gt;
        - Harold LaValley</description>
<pubdate>Tue, 01 Mar 2005 18:30:30 -0800</pubdate>
<dc:contributor>Harold LaValley</dc:contributor>
</item>
<item>
<title>jake comments on "Landing technology tested for future CEV"</title>
<description><!--[CDATA[<p-->The answer is extremely simple: An interchangable heatshield depending on the mission.A heavy duty robust one for missions from the Moon and Mars and a lighter duty one for trips from Earth orbit.I disagree a bit on having openings or hatches on the heatshield for airbag deploment.I feel that any type of mechanism to allow that,is an accident waiting to happen.I believe that a waterlanding is the safest  scenario and should be refined for the CEV.Look,if one chute fails on an air-bag touch-down..man,those men are going to hit super hard.At least with a water landing it wouldn't be as violent.The Delta Clipper that was cancelled was working on a retro rocket  vertcal  landing system....For manned expeditions to the Moon and Mars this is the best way to go.....]]&gt;
        - jake</description>
<pubdate>Sun, 25 Jul 2004 18:06:54 -0800</pubdate>
<dc:contributor>jake</dc:contributor>
</item>
<item>
<title>Dogsbd comments on "China Will Propose That NASA Use Shenzhou for International Space Station Duty"</title>
<description><!--[CDATA[<p-->"Editor's Note: This is according to Keith Cowing, so as always take it with a grain (or block) of salt."

<p>I really don't think such comments are needed or desirable. Keith Cowing can be a opinionated and a pain, but he is well connected and very often gets the "scoop" on the inside story at NASA.</p>
<p>I have to wonder, keeping in mind your past statements with regard to the Bush Administration, if your opinion of Cowing isn't colored by your dismissal of his and Frank Sietzen's book "New Moon Rising" and it's favorable presentation of the Bush Space Vision. </p>
<p>Regardless of the reason behind it, such statements are not conducive to civil discourse. If Cowing doesn’t meet your standards for journalism I would suggest you simply abstain from using him as a source.</p>]]&gt;
        - Dogsbd</description>
<pubdate>Tue, 01 Mar 2005 18:25:15 -0800</pubdate>
<dc:contributor>Dogsbd</dc:contributor>
</item>
<item>
<title>Chuck Longton comments on "NASA BUDGET GETS 2.4% INCREASE FOR 2006"</title>
<description><!--[CDATA[<p-->While it is true that the total heavy lift capacity of a Shuttle Derived Vehicle would not be required to lift the CEV, it needs to be mentioned that what I described was a full-up variation, not necessarily what would fly all the time. SDV’s do not necessarily need all the components I described on every flight. What I am describing is a FAMILY of vehicle capacities and configurations, able to be configured in many different ways, such as small, (no 2nd stage), possibly without SRB’s, to lift just a single CEV capsule, add 2, 3 or 4 SRB’s to lift CEV and supporting modules, add 2nd stage with 0, 2 or 3 SRB’s to lift medium cargo, with or without CEV, add 2, 3 or 4 SRB’s for heavy cargo lift. Eventually, the SRB’s would become liquid fueled, further enhancing the configuration variation possibilities. The advantage is in reusing all the existing infrastructure, facilities, personnel and experience, both at the cape, and in industry. What most people don’t stop to realize is that the cost of man-rating the EELV’s themselves would be only a tiny percentage of the cost of making the switch to them. Changing the entire infrastructure in industry and at the cape to use man-rated EELV’s, instead of SDV’s could potentially cost additional hundreds of billions of dollars, money that could otherwise be used on the project itself. Thousands of companies across the country are already geared to manufacturing Shuttle components. They know how to do it, and they know how to do it well. If they were to survive a switch to EELV’s at all, they would need to completely re-tool. I work in engineering in industry, and I have to tell you that it is an extremely expensive thing to do. Extremely expensive! And if they can’t afford to re-tool, they go out of business and would need to be replaced by new businesses, which would also have to bear the expense of tooling up. It is a totally unnecessary expenditure of very precious few dollars.<br/>
Look, I know that nobody likes to give the Russians credit for something well done, but think about the Soyuz launcher. The 1st satellite in 1957 was launched on the ancestor of today’s Soyuz. Their launcher industry was evolutionary. The launcher that put Sputnik into orbit in 1957 is still flying today (improved), delivering American and Russian personnel to the ISS. That's almost 50 years of flight history. Today's launcher is much different than when it began, but the changes were evolutionary, building on existing infrastructure and hardware. Today's launcher is every bit the equal of anything we currently have available, except the shuttle, which is much better. They continually improved an existing and capable system, making the best use of precious few rubles. They didn’t have the money to just throw everything away and start over every time. And you know what? Neither do we. To throw away a proven and capable system and infrastructure and start over from scratch with a new, unproven, less capable and more expensive system is just plain dumb.<br/>
SDV's would be better and more capable than ANYTHING which could EVER come out of the Delta and Atlas EELV's, and they would cost less. <br/>
What's not to like?]]&gt;
        - Chuck Longton</description>
<pubdate>Mon, 07 Feb 2005 11:02:06 -0800</pubdate>
<dc:contributor>Chuck Longton</dc:contributor>
</item>
<item>
<title>Chuck Longton comments on "Landing technology tested for future CEV"</title>
<description><!--[CDATA[<p-->I think this COULD have application for earth-based landings. The heat shield, if it is silica based, like the STS-TPS, need only be designed to “open” in several spots, like the Shuttle wheel wells, thru which the bags would deploy. Ablative shielding is not something that would be desirable on a reusable spacecraft. In my opinion, the heat shield should be a forward development of the current tile-based system used on the STS. Doing so allows all kinds of possibilities for the underside of the craft, including retro fire, deployable bags, crew egress and landing struts. Hey, if we’re going to do this, why not do it up and make it real. Does anybody really think that in 100 years, our spacecraft will “hard” land on the ground and tip over on their sides, or splash into the ocean and float until some ship can pick them up? No. They will land at some facility designed for that purpose, probably under power, and the pilot will be in complete control of the pin-point landing. So why not go down that path now, begin the thought process, and develop the landing hardware? It will only be a start, and probably won’t resemble anything from the future, but let’s begin it, and let the future develop from it.]]&gt;
        - Chuck Longton</description>
<pubdate>Sun, 25 Jul 2004 18:06:54 -0800</pubdate>
<dc:contributor>Chuck Longton</dc:contributor>
</item>
<item>
<title>Dogsbd comments on "NASA BUDGET GETS 2.4% INCREASE FOR 2006"</title>
<description><!--[CDATA[<p-->True Delta/Atlas were not built for manned flight, but then neither was the Atlas and Titans that launched Mercury and Gemini missions.

<p>Just as an educated guess, being in the engineering field myself, I would expect that altering the shuttle tank with RS-68’s underneath, altering the tank internally due to the differing fuel/oxygen needs of the RS68 compared to the SSME and adding another stage on top of the ET would be a more involved and expensive undertaking than would man rating a Delta or an Atlas.</p>
<p>It doesn’t make sense to me to use the heavy lift capacity of a shuttle-derived vehicle to launch people, and the medium lift ability of the EELV’s to launch cargo. And I do believe NASA has firmly made the decision that cargo and people will be separated to the extent possible and practical. So if a shuttle derived vehicle has a place in the VSE and if you separate the cargo and people; it would make more sense to me that the cargo would be launched on an unmanned shuttle derived heavy lift vehicle and crews would go up on a man rated EELV.</p>]]&gt;
        - Dogsbd</description>
<pubdate>Mon, 07 Feb 2005 11:02:06 -0800</pubdate>
<dc:contributor>Dogsbd</dc:contributor>
</item>
<item>
<title>craig comments on "Report: Japan Eyes Manned Base on Moon"</title>
<description><!--[CDATA[<p-->They launch 1 satellite and now these grandiose plans. What eventually became the Japanese component of ISS was originally an entire space infrastructure of various stations and spaceplanes.<br/>
I'd love to see it happen and their budget increased 6-fold. A Japanese base within rover-distance of a US base (and perhaps others) would offer safe havens and also the LEO-Moon transportation costs could be shared.<br/>
But right now I'd just like them to concentrate on what they're already meant to be doing, like Lunar-A that was meant to be launched in 2003, and SELENE, along with HTV and their BepiColombo contribution. One launch is a start, but they've still got a long way to go to recover credibility after a series of failures.]]&gt;
        - craig</description>
<pubdate>Mon, 28 Feb 2005 11:43:33 -0800</pubdate>
<dc:contributor>craig</dc:contributor>
</item>
<item>
<title>craig comments on "Space Race 2: NASA Ups The Space-Ride Ante"</title>
<description><!--[CDATA[<p-->K1 development has been delayed due to Kistler's bankruptcy - it's been around 75% complete for ages. But K1 offers a downmass capability that will be unmatched when the shuttle retires - IRDT &amp; Kliper will enable downmass but only a few hundred KGs each time.<br/>
If I were NASA Administrator then I'd be encouraging the likes of Kistler and SpaceX. Think the Falcon V would make a good cheap alternative for the Delta II to Discovery class missions (and Mars Scout ones) and keep these missions &lt;$300m for some time to come.<br/>
ISS fixed-cost resupply missions could be awarded to Kistler's K1, and perhaps CTV/CRV services to the Orbital capability SpaceX are apparrantly developing.<br/>
If the ETO crew/cargo elements of the exploration vision are similarly put out to private contractors that will represent quite a market for these services and NASA can concentrate on LEO-to-beyond activities.]]&gt;
        - craig</description>
<pubdate>Wed, 23 Feb 2005 15:01:32 -0800</pubdate>
<dc:contributor>craig</dc:contributor>
</item>
<item>
<title>Brad comments on "Space Race 2: NASA Ups The Space-Ride Ante"</title>
<description><!--[CDATA[<p-->What is the deal with Kistler?

<p>They have talented people, they spent boatloads of money, they have been at it for years and yet what have they got to show for it all?  Bankruptcy?</p>
<p>Just contrast that with SpaceX who are likely to put a satellite into orbit years before Kistler flys anything.</p>]]&gt;
        - Brad</description>
<pubdate>Wed, 23 Feb 2005 15:01:32 -0800</pubdate>
<dc:contributor>Brad</dc:contributor>
</item>
<item>
<title>Chuck Longton comments on "NASA BUDGET GETS 2.4% INCREASE FOR 2006"</title>
<description><!--[CDATA[<p-->I agree with Jake. I really like the Delta IV heavy and the Atlas V, I really do. BUT - they were designed for a different job, in a different world. To inject them into the man-rating arena is nothing but pure politics and an (understandable) attempt by Boeing and Lockheed-Martin to get their hands on some of that money. 

<p>The EELV's were never intended for man-rating, and would significantly delay the process and unnecessarily drive up the cost.  Shuttle derived components are the only thing that ACTUALLY makes sense. Put 3 or 4 RL-68's directly under the ET, add an S-4B 2nd stage, and configure the solids as 2, 3 or 4 strap-ons, depending on the launch mass, required delta-V, and the destination. We've already got all this stuff. It's already man-rated, and it all works great, right now. With this configuration, we could do, right now, anything that Project Constellation is likely to require for the next 30 years. We could do it (almost) today. </p>
<p>Look, everything this project needs for launch already exists, in proven configurations, for man-rated flights: all the components, the entire infrastructure, all the personnel, and the entire launch AND manufacturing facilities. It's spelled Shuttle-Derived. To take any other route is, in my humble opinion, just dumb. It would be a decision powered by lobbying influence, devoid of actual thinking, and would be a total disaster for Project Constellation. Delta IV and Atlas V definitely have a place in this vision, but NOT to launch people. </p>
<p>To abandon a proven, man-rated, functioning and completely capable system for one that is unproven, not man-rated, and actually inferior as far as launch capability goes, is just plain dumb. But that’s what NASA has always done. We abandoned the Saturn for absolutely no good reason, and that was a huge mistake. But now we could have Shuttle-derived configurations almost overnight, if only someone at NASA would just have the guts to make the most practical decision, not look back and run with it. My God, wouldn't that be a refreshing change?<br/>
</p>]]&gt;
        - Chuck Longton</description>
<pubdate>Mon, 07 Feb 2005 11:02:06 -0800</pubdate>
<dc:contributor>Chuck Longton</dc:contributor>
</item>
<item>
<title>craig comments on "CEV: let’s try and clear this up once and for all"</title>
<description><!--[CDATA[<p-->I think the CEV spiral 1 will be developed for ISS as well as other earth orbit missions, although by this time it may be that ETO operations are already being assumed by the private sector.<br/>
]]&gt;
        - craig</description>
<pubdate>Wed, 16 Feb 2005 22:15:20 -0800</pubdate>
<dc:contributor>craig</dc:contributor>
</item>
<item>
<title>jake comments on "Shuttle Launched With Fatal Defect For 25 Years"</title>
<description><!--[CDATA[<p-->The shuttle is a wonderment of engineering no doubt about it;however it was never the craft that Von Braun forsaw,thus cuts were made and 14 deaths happened !! Sad,but true. Nixon should not have cancelled Apollo. Can you immagine where we would be today if Apollo was still flying ? Refinement is the key word here.Apollo could have ended up as a true CEV and more safe than any manned spacecraft flying today.Look at Soyuz for example.Fabulous record ! Although archaic in nature,it gets the job done.It can even circumnavigate the Moon if need be !!Apollo was a triumph of design and engineering....With the Shuttle,they put the  " Cart before the horse "   ]]&gt;
        - jake</description>
<pubdate>Tue, 23 Mar 2004 20:49:05 -0800</pubdate>
<dc:contributor>jake</dc:contributor>
</item>
<item>
<title>jake comments on "CEV: let’s try and clear this up once and for all"</title>
<description><!--[CDATA[<p-->Let's keep things in the present for a moment;why indeed launch the first return to flight of the space shuttle with 7 astronauts ? This is a resupply mission that could be handled by 4 or even possibly 3 crew members.This is a TEST flight,not an all out go for broke mission.No one is completely sure that everything will work as planned.Why risk the lives of seven ? It boggles the mind of the decisions of Nasa brass to set up a mission with 7 aboard.I do sincerely hope that everything goes as plan,but the question remains." What if it doesn't " can Nasa's manned space flight program survive another tradgedy ?.I think not.More over,the decision has been made,however if I was in the position of launching the shuttle after over 2 years,it sure as hell wouldn't be with 7 astronauts on board.!!]]&gt;
        - jake</description>
<pubdate>Wed, 16 Feb 2005 22:15:20 -0800</pubdate>
<dc:contributor>jake</dc:contributor>
</item>
<item>
<title>jake comments on "NASA BUDGET GETS 2.4% INCREASE FOR 2006"</title>
<description><!--[CDATA[<p-->As long as the crew compartment sits above the " Fireworks " with an escape tower as in Apollo,I see no reason why a shuttle derived manned booster can't do the job of becoming a tried and proven format.A shuttle derived vehicle with 4 srb's and a second stage similar to the S-4B from the Saturn-5,would put this booster into the class of the Saturn -5.It has already been calculated that multiple launches are not cost effective compared to a single launch to boost all components at once.I feel that this type of booster could be ready to fly within 3 years if the go-ahead was given.We need a vehicle to boost the CEV and all it's equipment now.We cannot afford to wait.The SRB's are safe,the shuttle tank is safe,main engines are powerfull.All the parts are there...stop procrastinating and put it together.It would be a great machine.  ]]&gt;
        - jake</description>
<pubdate>Mon, 07 Feb 2005 11:02:06 -0800</pubdate>
<dc:contributor>jake</dc:contributor>
</item>
</channel>
</rss></body></html>